Lake Tillery

Location:

Lake Tillery, NC

 

Project Stats:

  • 750,000 CY of earthwork
  • 20,0000+ LF of storm drain
  • 400 LF of culvert
  • 22,700 LF of sewer
  • 21,000 LF of water line
  • 40,000 LF of curb
  • 64,000 SY of roadway

 

Project Overview:

HGC’s involvement with this 558-acre development began well before dirt started moving. Beginning in 2024, our team worked alongside Lennar through the budgeting and feasibility stages, helping plan for the unique complexities of developing a large-scale community along the lake.

 

HGC mobilized in the summer of 2025, with significant site progress underway by the fall. With the project’s proximity to the lake, environmental protection has been a priority from day one. Extensive erosion-control measures include approximately 40 erosion-control basins and more than 40,000 linear feet of silt fence, helping keep material contained on site while protecting the surrounding environment and community.

 

The multi-phase development brings significant infrastructure and earthwork to the site. Upon completion, the project will include four stream crossings, more than 400 linear feet of culverts, and approximately 750,000 cubic yards of earth moved.

 

One of the most unique pieces of the project is what’s happening underground. The site’s rolling lakeside topography calls for not one, but three different types of sanitary sewer systems—gravity, force main, and low-pressure. Each system plays a different role in moving wastewater across the property, creating an interesting mix of infrastructure engineered specifically around the natural terrain of the site.

 

From early budgeting and feasibility through construction, this project showcases the value of thoughtful planning, environmental stewardship, technical expertise, and strong collaboration between HGC and Lennar as we help bring this lakeside community to life.

 

Lennar Charlotte