Lincolnton Retail
Location:
Lincolnton, NC
Project Stats:
Scope of Work: Clearing, grubbing, erosion control, demo, surveying, grading, chemical soil manipulation, storm, water, sewer, Gravix Wall system, fine grading, stream relocation, curb & gutter, asphalt, NCDOT road improvements
- Brownfield Site
- 10 acres of clearing & grubbing
- 1,600 LF silt fence
- 3 temporary sediment basins
- 5,800 LF of super silt fence
- 200,000 CY of dirt moving
- 16,247 SF of Gravix Wall
- 8,000 tons of stone for wall foundation remediation
- 128,000 SF building pad
- 11,437 SY logistics road
- 3,600 LF of storm drainage with depths ranging between four feet and thirty feet
- 528 LF of 72” storm drainage with depths ranging between twenty-six feet and thirty-four feet
- 2,178 LF of sanity sewer
- 3,820 LF of water
- 8,325 LF of curb & gutter
- 27,959 SY of asphalt
Collaborating Partners:
L.F. Jennings, RICASHA, Trifecta, Rite Site, Global Stability, The Green Group, A1-Fence, Bullington Construction, BERCO, Superior Hydro Excavation, CXT, Maymead, StripeTech, Fortiline, Mike Oehler Trucking, Material Sales
Project Details:
We are excited about this new partnership with L.F. Jennings. This project presented unique challenges due to the site’s brownfield status and stream relocation, making it an extremely environmentally sensitive project. However, through strong communication, planning, and execution between the county, L.F. Jennings, and HGC, we were able to keep erosion well under control throughout the process.
The men and women of HGC truly went above and beyond on this project and demonstrated what it means to be part of the HGC team. There were many long nights and Saturdays worked to exceed expectations. As a result of this dedication, the building pad was delivered nearly two months ahead of schedule, and on-site paving began approximately six months early.
HGC is excited for the future and looks forward to continuing a strong partnership with L.F. Jennings.